January 2019

Designing Leaner Temporary Works

Designing Leaner Temporary Works - 21/01/19

Welcome back to Tony’s Technical Blog

It’s certainly been a while, a year to be exact since my last post, where has the time gone?

Anyway, to get back in the saddle so to speak, I thought I would reproduce a 5-minute “Viewpoint” article that I presented back at last October’s GE Basement Conference. As long term sponsors of this event, we are entitled to plan out one of the themed breakout sessions. The theme we settled on was "Designing Leaner Temporary Works".  To start the session we had three 5-min viewpoint presentations; contractor, consultant and supplier i.e.me, on how this could be achieved. This was how I see it from a designer/supplier’s perspective.

Tony Gould

Latest Articles

View all...
Temporary works tool gets a fourth upgrade from Groundforce Shorco

Temporary works tool gets a fourth upgrade from Groundforce Shorco - 16/05/23

YourSolution, Groundforce Shorco’s interactive design tool, upgrades to 1.4.

Groundforce provides comprehensive support package for water diversion

Groundforce provides comprehensive support package for water diversion - 09/05/23

Groundforce Shorco and sister division Piletec have come together to provide a turnkey ground...